STA 1+00The site
The site
Scale, water and wires on one site
Four conditions shaped the sequence of the work.
Slopes and flood-prone ground
Undulating terrain and flood-prone areas decided where roads, lots and ponds could go, and how much earth had to move to make them work.
Environmental rules and ecological zones
Stream buffers and ecological zones brought strict regulatory requirements that had to be understood early, before any layout hardened around them.
Cut, fill and drainage
Grading had to balance cut and fill across a very large area while water was managed through the whole site, in phases built at different times.
Utilities, lines and access
Storm, sewer, water and fire mains were coordinated with the transmission network, and vehicle turning checked for construction traffic and for the finished community.
STA 2+00The decisions
The decisions
Three stages, one region at a time
The sequence let each region be designed with the answers learned in the one before.
Stage 1: South 123
Work began in the south, building on the client’s preliminary designs. GIS data surfaced regulatory and ecological issues early, before they could shape the layout.
Stage 2: the northern region
The more complex northern region came next. Grading alternatives were modeled and compared to balance environmental preservation against regulatory requirements before a design was chosen.
Stage 3: South 456 and North together
The final stage developed South 456 and North simultaneously, with grading, stormwater and utility layouts coordinated across both regions at once.
STA 3+00AXANH’s role
AXANH’s role
What AXANH delivered
A complete design package for a very large site, delivered on a shared platform and built with the Autodesk tools below.
WHAT WE DELIVERED
Construction documents on Autodesk Construction Cloud. Grading and stormwater system designs. Utility layouts. Vehicle turning (swept-path) analysis. Walkthroughs and fly-throughs for stakeholder presentations. Support for the client’s as-built plan set, for future maintenance and operations.
HOW THE WORK STAYED ALIGNED
One shared platform for documents and issues kept the team and project partners on the same set. Visual walkthroughs gave stakeholders a clear picture of the design, and consistent documentation carried decisions from one phase to the next.
- Autodesk Civil 3D
- Autodesk InfraWorks
- Autodesk Storm and Sanitary Analysis
- Vehicle Tracking
- Dynamo
- Autodesk Construction Cloud
STA 4+00What it shows
What it shows
What this project says about working with AXANH
Scale handled in stages
A very large site becomes manageable when it is designed region by region, with each stage settling rules the next one can use.
Early regulatory screening
Reading ecological and regulatory limits through GIS data at the start means the layout is built around them, not corrected afterward.
Designed to be reviewed
Phasing, scenario testing and clear visuals all serve one goal: giving reviewers a design they can read and evaluate with confidence.
Related reading
More projects
Mitchell Mill Development
A 142-acre, 382-lot community in Wake County, North Carolina: roadway profiles, retaining walls and swales on steep ground.
Marks Creek Development
A 101-acre, 376-lot wooded site with a transmission network, designed end to end with a BIM workflow.
Robertson Development
A 200-acre, 644-lot community with rolling terrain and a distant sewer connection, produced under the client’s Professional Engineers.