Robertson Development: aerial view of a neighborhood with houses, roads, ponds and green spaces

ROBERTSON · WAKE COUNTY, NC

STA 0+00 · PROJECT

Terrain engineering · Wake County, North Carolina

Robertson Development: 644 lots on rolling ground, designed pad by pad.

A 200-acre community in Wake County, North Carolina, planned for 644 lots at a construction density of 4.0 dwelling units per acre. Rolling terrain made it hard to balance the site across every lot, and each building pad needed its own front and rear slopes to the streets and alleys. AXANH worked as the client’s outsourcing partner from initial design to approval of the Construction Documents set, under the guidance of the client’s Professional Engineers.

200acres
644lots
4.0dwelling units per acre, planned
NCWake County
Discuss a Similar Site All Projects

STA 1+00The site

The site

Rolling ground, small pads, a far-off manhole

Four conditions decided how the grading had to work.

01

Rolling terrain

Infrastructure had to fit natural slopes, and balancing earthwork across hundreds of lots was hard on ground that never stayed level, so every street followed the land.

02

Pad-by-pad slopes

Every building pad needed its own front and rear slopes to street and alley, so grading was a lot-level task as much as a site-level one.

03

A distant sewer connection

The existing sanitary sewer manhole sat a considerable distance from the site, which put the depth of the new connection in question from the start.

04

Density at four units per acre

At 4.0 dwelling units per acre, every street, alley and lot had to fit the ground together, with little room to hide a grading problem.

STA 2+00The decisions

The decisions

Three fixes that made the plan work

Each one was a design change, drawn, reviewed and revised with the client’s engineers.

Long profile of the new sanitary sewer connectionA long profile from the subdivision to a distant existing manhole. A smaller pipe at its steeper minimum slope would arrive below the manhole invert. A larger pipe can run at a flatter minimum slope, so the new gravity sewer enters the manhole above the existing invert.SubdivisionA considerable distanceExisting groundExisting manholeExistinginvertSmaller pipe at its steeper minimum slopewould arrive below the manholeLarger pipe, flatter slopeEnters above the existing invert
Concept diagram of the sewer logic, not a project drawing.
D1

Adjust the roadway profiles

Roadway elevations and slopes were adjusted to follow the topography rather than fight it, which gave the lots a more workable starting point.

D2

Even out the elevations

Street and alley profiles were refined to reduce elevation differences between lots, and retaining walls behind the residences kept slopes uniform.

D3

Make the sewer connection work

The pipe size was increased so the line could run at a flatter slope while still meeting minimum slope and velocity requirements. That kept the new sewer arriving above the invert of the existing manhole.

STA 3+00AXANH’s role

AXANH’s role

How the partnership worked

AXANH carried nearly all plan production while the client’s Professional Engineers kept design authority.

THE WORKING LOOP

AXANH produced the detailed plans. The client’s Professional Engineers marked them up or listed the updates they needed, and we revised, round after round, until final approval. Design authority stayed with the client throughout.

WHAT WENT INTO THE PLAN SET

Detailed design plans and the Construction Documents set, with views of the proposed layout, the proposed surface, the storm drainage network and the sanitary sewer network, below.

Civil 3D proposed layout of lots, streets and alleys for the Robertson Development subdivision in Wake County, North Carolina
Proposed layout
Civil 3D proposed finished-grade surface model for the sloped Robertson Development subdivision
Proposed surface
Civil 3D storm drainage network laid out along the Robertson Development street grid
Storm network
Civil 3D gravity sanitary sewer network connecting the Robertson Development subdivision to an existing manhole
Sanitary sewer network
Watch the project walkthrough

STA 4+00What it shows

What it shows

What this project says about working with AXANH

01

Plan production at partner scale

Taking nearly all plan production lets a client’s engineers spend their time on design decisions, review and approval.

02

Design authority stays put

Our engineers prepare and revise; the client’s Professional Engineers decide. The model works because the line is clear.

03

Revision loops that converge

Clear markups, one set of plans and a team that revises quickly bring each round closer to approval.

More projects

MORE

Mitchell Mill Development

A 142-acre, 382-lot community in Wake County, North Carolina: roadway profiles, retaining walls and swales on steep ground.

View project — Mitchell Mill Development

MORE

Baptist Development

A 600-acre, 777-lot development with flood-prone areas, stream buffers and a transmission network, delivered in three stages.

View project — Baptist Development

MORE

Marks Creek Development

A 101-acre, 376-lot wooded site with a transmission network, designed end to end with a BIM workflow.

View project — Marks Creek Development

STA 5+00Start the conversation

Next step

Need a partner who can carry plan production under your engineers’ direction?

Tell us about your pipeline and your review process. We will help you find the right first package.

Start a Conversation Check Partnership Fit