BAPTIST DEVELOPMENT · 600 ACRES · 777 LOTS

STA 0+00 · PROJECT

Large-scale land development · Phased delivery

Baptist Development: 777 lots across 600 acres, delivered in phases.

At 600 acres and 777 lots, Baptist is the largest of the four projects featured here. The land is undulating and flood-prone, crossed by stream buffers and an established electrical transmission network. We worked with partners and organized the project as a sequence, one region at a time, with a GIS review of regulatory and ecological issues running from the start.

Discuss a Similar Site All Projects
600acres
777lots
3delivery stages

STA 1+00The site

The site

Scale, water and wires on one site

Four conditions shaped the sequence of the work.

01

Slopes and flood-prone ground

Undulating terrain and flood-prone areas decided where roads, lots and ponds could go, and how much earth had to move to make them work.

02

Environmental rules and ecological zones

Stream buffers and ecological zones brought strict regulatory requirements that had to be understood early, before any layout hardened around them.

03

Cut, fill and drainage

Grading had to balance cut and fill across a very large area while water was managed through the whole site, in phases built at different times.

04

Utilities, lines and access

Storm, sewer, water and fire mains were coordinated with the transmission network, and vehicle turning checked for construction traffic and for the finished community.

STA 2+00The decisions

The decisions

Three stages, one region at a time

The sequence let each region be designed with the answers learned in the one before.

Phased delivery in three stagesA GIS review of regulatory and ecological issues runs across the whole project. Delivery runs in three overlapping stages: South 123, then the northern region, then South 456 together with North.GIS review of regulatory and ecological issues, from the start1 · South 1232 · North3 · South 456 + NorthBuilds on the client’s preliminary designsGrading alternatives comparedDeveloped simultaneously
Concept diagram of the delivery sequence, not a project schedule.
D1

Stage 1: South 123

Work began in the south, building on the client’s preliminary designs. GIS data surfaced regulatory and ecological issues early, before they could shape the layout.

D2

Stage 2: the northern region

The more complex northern region came next. Grading alternatives were modeled and compared to balance environmental preservation against regulatory requirements before a design was chosen.

D3

Stage 3: South 456 and North together

The final stage developed South 456 and North simultaneously, with grading, stormwater and utility layouts coordinated across both regions at once.

STA 3+00AXANH’s role

AXANH’s role

What AXANH delivered

A complete design package for a very large site, delivered on a shared platform and built with the Autodesk tools below.

WHAT WE DELIVERED

Construction documents on Autodesk Construction Cloud. Grading and stormwater system designs. Utility layouts. Vehicle turning (swept-path) analysis. Walkthroughs and fly-throughs for stakeholder presentations. Support for the client’s as-built plan set, for future maintenance and operations.

HOW THE WORK STAYED ALIGNED

One shared platform for documents and issues kept the team and project partners on the same set. Visual walkthroughs gave stakeholders a clear picture of the design, and consistent documentation carried decisions from one phase to the next.

  • Autodesk Civil 3D
  • Autodesk InfraWorks
  • Autodesk Storm and Sanitary Analysis
  • Vehicle Tracking
  • Dynamo
  • Autodesk Construction Cloud
Watch the project walkthrough

STA 4+00What it shows

What it shows

What this project says about working with AXANH

01

Scale handled in stages

A very large site becomes manageable when it is designed region by region, with each stage settling rules the next one can use.

02

Early regulatory screening

Reading ecological and regulatory limits through GIS data at the start means the layout is built around them, not corrected afterward.

03

Designed to be reviewed

Phasing, scenario testing and clear visuals all serve one goal: giving reviewers a design they can read and evaluate with confidence.

More projects

MORE

Mitchell Mill Development

A 142-acre, 382-lot community in Wake County, North Carolina: roadway profiles, retaining walls and swales on steep ground.

View project — Mitchell Mill Development

MORE

Marks Creek Development

A 101-acre, 376-lot wooded site with a transmission network, designed end to end with a BIM workflow.

View project — Marks Creek Development

MORE

Robertson Development

A 200-acre, 644-lot community with rolling terrain and a distant sewer connection, produced under the client’s Professional Engineers.

View project — Robertson Development

STA 5+00Start the conversation

Next step

Facing a large site that needs a clearer path to approval?

Tell us about the size, the constraints and where the project stands. We will help you see where AXANH can start.

Start a Conversation Check Partnership Fit